Project commenced on schedule with significant progress: 247 drawings completed and approved, representing 62% of total scope. Current completion rate exceeds baseline projections by 12%, indicating efficient workflow optimisation and team coordination. Five items require immediate attention for technical review, primarily related to foundation details and MEP coordination conflicts. The design team has prioritised these for resolution within the next sprint cycle. Overall project health remains positive with no critical blockers identified.
| Issue | Description | Priority | Days Overdue | Assignee |
|---|---|---|---|---|
| Structural Steel Drawing Missing | Level 3-5 structural steel fabrication drawings not received from contractor | Critical | 17 | J. M. Chan |
| HVAC Ductwork Not Submitted | HVAC ductwork details with electrical conduits in zones B-C | High | 12 | A. Smith |
| Plumbing Design Conflict | Revised plumbing routing creates clash with structural beam B-8 | High | 8 | P. Johnson |
| Fire Safety System Documentation | Updated sprinkler system layouts required for building control submission | High | 9 | A. R. Williams |
| Facade Panel Shop Drawings | Curtain wall panel details missing thermal performance data | Medium | 4 | J. L. Chen |
Drawing review sessions targeting 79% completion from 124 total submissions. MEP drawings show the strongest performance at 86% completion with 134 approved submittals, while structural and civil packages maintain steady advancement at 65% and 81% respectively.
Landscape has yet to gain full approval from the total scope of 410 submissions across all disciplines. 51 drawings remain in pending review, primarily concentrated in architectural and MEP coordination details. The overall approval rate of 83% exceeds project benchmarks and supports the current construction schedule milestones.
Six active technical submittals currently being tracked. The HVAC equipment specifications have achieved full approval status, establishing a foundation for mechanical system installation scheduling.
Submittal TS-002 covering curtain wall system details from Facade Experts Inc. remains under active review with timeline TBC. Fire protection system layout requires resubmission following initial rejection. The submittal approval rate of 68% reflects strong design coordination.
Material testing confirms concrete compression tests achieved 32.7 MPa strength, exceeding the 30 MPa requirement by 17%, while steel reinforcement tensile strength reached 544 MPa. Structural material approvals support continued construction progress and validate design assumptions for load-bearing elements.
Brick masonry water absorption testing remains pending final laboratory analysis, collected from the east wall facade. The 50% pass rate reflects typical early-stage construction. Bearing capacity testing yielded 140 kN per element against the required 120 kN/mΒ² standard.
Foundation work preceded the original August 28th target, finishing September 3rd. Ground floor slab operations are currently advancing through the structural phase at approximately 68% completion, maintaining alignment with the October 19th programme milestone. Upcoming steel installation for Level 1 remains on schedule for September 28th.
Structural steelwork has three potential delays with a 5-day buffer concern for the October 25th target date, primarily due to coordination dependencies from preceding structural and MEP activities. Overall delivery is progressing within typical construction project parameters.
| Document | Rev | Status | Due Date | Assignee | Comments |
|---|---|---|---|---|---|
| MEP Coordination Drawings | Rev 1 | Approved | 08 Jan | A. Jeffries | Coordination meeting raised comments; under review. |
| Environmental Impact Assessment | Rev 2 | Approved | 12 Jan | D. Pearce | Issued for review. |
| Structural Foundation Details | Rev 3 | Approved | 18 Jan | P. Martinez | Tracking to programme. |
| Building Services Integration Plan | Rev 4 | In Review | 24 Jan | R. Khan | Awaiting client confirmation. |
| Building Control Submission Package | Rev 5 | In Progress | 30 Jan | K. Miller | Coordination meeting raised comments; under review. |
| Accessibility Compliance Report | Rev 1 | In Progress | 05 Feb | C. Roberts | Issued for review. |
| Acoustic Performance Analysis | Rev 2 | Pending | 12 Feb | B. Chu | Awaiting client confirmation. |
| Geotechnical Investigation Report | Rev 3 | Overdue | β 20 Feb | E. Wilson | Issued for review. |
| Energy Performance Certificate | Rev 4 | Rejected | 28 Feb | A. Clarke | Coordination meeting raised comments; under review. |
| Landscape Architecture Plans | Rev 5 | Draft | 08 Mar | J. Diello | Awaiting client confirmation. |
| Structural Load Schedule β Level 3 | Rev 1 | Approved | 15 Mar | B. Brown | Tracking to programme. |
| Fire Safety Statement β Retail Areas | Rev 2 | Approved | 22 Mar | C. Brown | Issued for review. |
| Water Management Strategy | Rev 3 | Approved | 28 Mar | A. Choi | Coordination meeting raised comments; under review. |
| BIM Execution Plan | Rev 4 | In Review | 01 Apr | L. Davis | Issued for review. |
| CDM File β Pre-Construction Information | Rev 5 | In Progress | 08 Apr | M. Chen | Tracking to programme. |
| Architectural Specification | Rev 1 | In Progress | 15 Apr | J. Smith | Awaiting client confirmation. |
| Structural Specification | Rev 2 | Pending | 18 Apr | R. Johnson | Coordination meeting raised comments; under review. |
| Mechanical Specification | Rev 3 | Overdue | β 22 Apr | K. Williams | Issued for review. |
| Electrical Specification | Rev 4 | Rejected | 25 Apr | A. Jeffries | Awaiting client confirmation. |
| Public Health Specification | Rev 5 | Draft | 28 Apr | D. Pearce | Issued for review. |
| TIDP Master Document | Rev 1 | Approved | 02 May | P. Martinez | Coordination meeting raised comments; under review. |
| Information Delivery Plan β Stage 4 | Rev 2 | Approved | 05 May | R. Khan | Awaiting client confirmation. |
| Information Delivery Plan β Stage 5 | Rev 3 | Approved | 10 May | K. Miller | Tracking to programme. |
| Daylight & Sunlight Report | Rev 4 | In Review | 15 May | C. Roberts | Issued for review. |
| Thermal Performance Calculation | Rev 5 | In Progress | 22 May | B. Chu | Coordination meeting raised comments; under review. |
| Reception Lobby Sample Layout | Rev 1 | In Progress | 30 May | E. Wilson | Issued for review. |
| Washroom General Arrangement Set | Rev 2 | Pending | 08 Jan | A. Clarke | Tracking to programme. |
| Stair Pressurisation Calc | Rev 3 | Overdue | β 12 Jan | J. Diello | Awaiting client confirmation. |
| Mast Climber Loading Calc | Rev 4 | Rejected | 18 Jan | B. Brown | Coordination meeting raised comments; under review. |
| FaΓ§ade Loading Schedule | Rev 5 | Draft | 24 Jan | C. Brown | Issued for review. |
| Wayfinding & Signage Strategy | Rev 1 | Approved | 30 Jan | A. Choi | Awaiting client confirmation. |
| M&E Commissioning Plan | Rev 2 | Approved | 05 Feb | L. Davis | Issued for review. |
| O&M Manual Index | Rev 3 | Approved | 12 Feb | M. Chen | Coordination meeting raised comments; under review. |
| Site Logistics Plan | Rev 4 | In Review | 20 Feb | J. Smith | Awaiting client confirmation. |
| Demolition Method Statement | Rev 5 | In Progress | 28 Feb | R. Johnson | Tracking to programme. |
| Asbestos Survey Report | Rev 1 | In Progress | 08 Mar | K. Williams | Issued for review. |
| Risk Register β Live | Rev 2 | Pending | 15 Mar | A. Jeffries | Coordination meeting raised comments; under review. |
| Design Coordination Tracker | Rev 3 | Overdue | β 22 Mar | D. Pearce | Issued for review. |
| BREEAM Pre-Assessment | Rev 4 | Rejected | 28 Mar | P. Martinez | Tracking to programme. |
| Sustainability Statement | Rev 5 | Draft | 01 Apr | R. Khan | Awaiting client confirmation. |
| WELL Assessment | Rev 1 | Approved | 08 Apr | K. Miller | Coordination meeting raised comments; under review. |
| Cycle & Shower Provision Schedule | Rev 2 | Approved | 15 Apr | C. Roberts | Issued for review. |
| External Lighting Strategy | Rev 3 | Approved | 18 Apr | B. Chu | Awaiting client confirmation. |
| Public Realm Maintenance Plan | Rev 4 | In Review | 22 Apr | E. Wilson | Issued for review. |
| Refuse Strategy | Rev 5 | In Progress | 25 Apr | A. Clarke | Coordination meeting raised comments; under review. |
| Loading Bay Operations Plan | Rev 1 | In Progress | 28 Apr | J. Diello | Awaiting client confirmation. |
| Vibration & Acoustic Mitigation | Rev 2 | Pending | 02 May | B. Brown | Tracking to programme. |
| Wind Microclimate Report | Rev 3 | Overdue | β 05 May | C. Brown | Issued for review. |
| FaΓ§ade Access Strategy | Rev 4 | Rejected | 10 May | A. Choi | Coordination meeting raised comments; under review. |
| Plant Replacement Strategy | Rev 5 | Draft | 15 May | L. Davis | Issued for review. |